Some Of Our Work

EXPERTISE
 D3 Integrated Solutions has over four years of experience working on low voltage systems in
hotels.

 Our company employs highly educated network engineers and well trained cabling and
installation technicians with over 15 years of experience.

 We specialize in structured cabling, converged networks and systems integration.

SERVICES
We offer low voltage systems planning and engineering. Our services include structured cabling, copper
and fiber infrastructure, equipment installation and customer training for:
 Local cable TV systems
 Data network systems
 IP phone systems
 IP Surveillance systems
 Audio/video distribution
 Digital signage and video walls
 Back ground music systems
 Access control

MAJOR RECENT PROJECTS

 2016. Westin Hotel, 805 Clarck Pl, Nashville, TN 37203.
New built, 27 story/ 456 rooms. Project with ongoing work.

 2015-2016. Embassy and Suites, 535 Smithfield St, Pittsburgh, PA 15222.
Hotel renovation in Oliver building from 15th to 25th floor /225 suites. Worked on audio/video
distribution, surveillance system, back ground music, TV signal distribution and cable
certification with document package for AT&T following HHonors standards.

 2015. Hyatt Place, 5252 W. Alabama St, Houston, TX 77056.
New built hotel, 12 floors/ 157 rooms. Worked on audio video distribution, music system and
surveillance system.

 2015. Hilton Garden Inn, North Loop. 66 East Wacker place, Chicago, IL 66601.
New built hotel. Worked on cable certification and documentation package for AT&T following
HHonors standards and phone system installation.

 2015. Spring Hill and Suites by Marriott, 20303 Chace wood Park Dr, North west Houston, TX
77070.
New built hotel 5 floors /139 suites. Worked on audio/video distribution, music system and TV
signal distribution.

 2015. Hilton Garden inn, 5730 Rim pass, San Antonio, TX 78257.
New built hotel, 6 stories / 142 rooms. Worked on structured copper and fiber cabling with
equipment installation for TV system, data network, phone system, surveillance, back ground
music and certification with document package for AT&T following HHonors standard.

 2014. Le Meridien The Joseph Hotel, 620 North High Street, Columbus, OH 43215.
New built, 10 floors / 137 rooms and 14 suites. Worked on structured cabling and equipment
installation for TV system, WIFI, data network, phone system, surveillance, digital signage, back
ground music, data center and video wall feature.

 2014. Hampton inn and Suites, 3160 Olentangy River Road, Columbus, OH 43202.
New built hotel, 7 stories /152 rooms. Worked on structured cabling and equipment installation
for data network, TV system, surveillance, back ground music and digital signage.

 2014. Springhill and Suites, 15555 North Fwy, Houston, TX 77040.
New built, 4 stories/ 104 suites. Structured low voltage cabling for TV, data, voice and music.

 2013-2014. Le Meridien, 2100 Spring Rd, Oak Brook, IL 60523.
Hotel building renovation, 8 floors/ 192 rooms. Installation of Phy bridge IP data network for
phone system.

 2013. Courtyard by Marriott, 1500 Washington avenue South, Minneapolis, MN 55454.
Hotel building renovation. 14 floors/243 rooms. Worked on cabling and equipment installation
for WIFI, back ground music, data network, surveillance and TV system.

 2013. Fairfield and Suites downtown Milwaukee, 710 N Old World 3rd St, Milwaukee, WI 53203.
Hotel building renovation.12 stories, 96 rooms. Worked on cabling and equipment installation
for cable TV, surveillance, WIFI, back office and business center, data network and back ground
music system.

 2012. Sheraton- Romulus, 8000 Merriman Rd, Romulus, MI 48174.
Cat6 cabling for WIFI and equipment installation.